Ft. Eustis Bridge Repair

Ft. Eustis Bridge Repair

Date: 24 Jan 2015
Category: Upper Warwick Corridor

This crucial connector road bridge replacement project and its return to full service was a welcome relief for travelers into and out of the Upper Warwick Corridor, as well as Fort Eustis, in particular. The new bridge replaced one built in the 1960s that had long outlasted its useful lifespan. With immediate on-ramp access to I-64, the bridge is now providing a wider, safer passage than its predecessor. The $6.3 million project was a City-administered VDOT program, with majority funding through City sources, followed closely by State Revenue Sharing garnered by the Department of Engineering. The adjacent Reservoir Bridge, which was also built in the 1960s and is longer, is scheduled for replacement in the near future.

Visit website